Demand-Controlled Ventilation: Matching Fresh Air to Building Use

Is Your Building's Ventilation Costing More Than It Should?

Most commercial buildings heat fresh air for a full house all day, every day, even when the office is half empty, the hall is unused or the meeting rooms are dark. In winter, that is money spent warming air the building then throws away.

Demand-controlled ventilation (DCV) fixes that by adjusting the fresh air supply to how many people are in each space, using sensors rather than a fixed schedule. This guide explains how it works, what the evidence says about savings, what the law requires of you, and how to find out whether your building is a good candidate.

Who this guide is for

This guide is for anyone who pays the heating bill for a building with variable occupancy and has to explain it to someone else. That includes office managers and business owners running their own premises, school business managers in academy trusts, operations leads in care homes and hotels, and facilities or estates managers looking after several sites.

You do not need an engineering background. You need enough working knowledge to ask a contractor the right questions and make a sound case internally. If your premises are in Milton Keynes or the surrounding towns, this is written with your buildings in mind.

The heating-season problem: paying to warm air you then throw away

Demand controlled ventilation image PGS

Most mechanical ventilation systems run at a fixed rate sized for full occupancy, whether the building holds two hundred people or twenty. In winter your boilers or heat pumps work to warm the incoming air, and the system then extracts it again from half-empty floors, unused classrooms and vacant function rooms.

A familiar pattern in commercial buildings: energy bills keep climbing, senior management wants an explanation, and nobody can point to exactly where the money is going. Over-ventilation is one of the most common culprits and one of the least visible, because the system is doing exactly what it was set up to do.

The answer is not switching ventilation off or turning it down by hand. That risks stale air, condensation and a breach of your legal duty to ventilate. The answer is matching supply to actual use, automatically.

If your ventilation runs flat out regardless of occupancy, it is worth a conversation. Call Plumbing & Gas Solutions on 01908 569031 or read about our commercial HVAC services.

What the law requires

Two sets of rules matter here, and it helps to keep them apart.

Regulation 6 of the Workplace (Health, Safety and Welfare) Regulations 1992 requires enclosed workplaces to have a sufficient quantity of fresh or purified air. It does not prescribe one numerical airflow rate or CO₂ limit for every office. HSE’s L24 guidance says fresh-air supply should normally be at least 5–8 litres per second per occupant, with the appropriate rate depending on the space, activity and equipment.

Building Regulations guidance serves a different purpose. For relevant office building work in England, Approved Document F, Volume 2, paragraph 1.32 gives a ventilation rate of 10 litres per second per person or 1 litre per second per square metre, whichever produces the higher total airflow. These are building-design guidance figures, not a blanket operating rule for every existing office. Any new or altered ventilation installation must be assessed against the applicable Building Regulations requirements.

The practical point: DCV should reduce unnecessary ventilation without compromising the fresh-air supply appropriate to the building, its occupants and its applicable requirements.

Demand controlled ventilation image of a PGS engineer

How demand-controlled ventilation works in practice

Controlled ventilation in plant room

DCV links your air handling equipment to live information about how each space is being used. CO₂ sensors are the most common approach, because CO₂ rises predictably with the number of people breathing in a room.

Demand-controlled ventilation adjusts fresh-air delivery in response to demand, often using CO₂ measurements as an indicator of occupancy-related ventilation needs. HSE advises that CO₂ readings consistently above 1,500 parts per million (ppm) in occupied rooms indicate poor ventilation requiring improvement. These readings are ventilation indicators, rather than universal legal limits or prescribed control settings. System settings and minimum airflow rates should be established for the building’s use, occupancy and applicable requirements, with performance verified during commissioning.

In a retrofit, the usual components are CO₂ or occupancy sensors in the zones that matter, variable speed drives on the supply and extract fans, motorised dampers where zones share an air handling unit (AHU), and a controls update so the system responds zone by zone. Where a building management system (BMS) is already in place, DCV is integrated into it rather than bolted on beside it, which also gives you the logged data to show management that the investment is working.

What the evidence says about savings

The savings depend on how variable your occupancy is. Schools empty by late afternoon and sit idle for 13 weeks a year, hotel function rooms are unused between events, and hybrid-working offices rarely fill. In these buildings a fixed-rate system over-ventilates for most of its operating hours.

The Chartered Institution of Building Services Engineers (CIBSE) sets out the principle in its CPD module on demand-controlled ventilation: most buildings run below design occupancy most of the time, and DCV saves on fan power and on heating and cooling the ventilation air. A 2018 CIBSE Technical Symposium study of a retrofit to an 11-storey London office modelled annual energy savings of up to 39 per cent on the fresh air plant, equal to around 4 per cent of the whole building’s energy use.

Two things follow from that. First, the saving is real and largest in winter, when every cubic metre of outside air has to be heated. Second, the whole-building percentage is modest, so the business case should be built on your own plant, occupancy and energy prices, not on a headline figure. Any proposal worth considering will show that calculation.

Six steps to find out if DCV is right for your building

  1. Map your occupancy patterns. Walk the building at different times over a typical week and note which zones sit empty while ventilation runs at full rate. Meeting rooms, halls and canteens are the usual suspects.
  2. Pull twelve months of gas and electricity bills. You need a baseline to measure any saving against, and the winter months will show you where the heating load sits.
  3. Review your existing plant. Check whether your AHUs and fans can accept variable speed drives and new controls, or whether they are approaching end of life. If a replacement is due anyway, DCV is cheapest to build in at that point.
  4. Prioritise the high-waste zones. Start with the spaces showing the biggest gap between design occupancy and actual use, rather than the whole estate at once.
  5. Agree the control settings in writing. CO₂ setpoints and minimum airflow rates for each zone should reflect the building’s use, occupancy and applicable requirements, and be verified during commissioning.
  6. Insist on commissioning and verification. The system should be commissioned zone by zone, and sensor logs and energy data reviewed after the first full heating season to confirm the saving and fine-tune the settings.

Where PGS fits in

Plumbing & Gas Solutions installs, maintains, repairs and upgrades commercial ventilation, including AHUs, mechanical ventilation with heat recovery (MVHR) and air distribution systems, alongside controls and BMS work. We can design and specify a system or work to an existing consultant’s specification, and we are REFCOM F-Gas certified (REF1024497) for the air conditioning and heat pump plant that often sits alongside it.

We offer a free initial HVAC site evaluation. It is a starting point rather than a detailed technical condition survey: we review the installed equipment, discuss known faults, look at the maintenance information you have, and understand how the building is used. If further investigation is needed, we explain what and why before any additional work is undertaken. A dedicated project manager coordinates any work that follows, so you have one point of contact throughout.

We cover Milton Keynes and the surrounding area, generally within about 20 miles of our Knowlhill base, including Newport Pagnell, Bletchley, Bedford, Buckingham, Northampton, Leighton Buzzard, Aylesbury and Luton.

What to watch out for

Ventilation image of a pgs engineer in an office

– Sensors in the wrong place. A CO₂ sensor near a door or a supply grille gives false readings and undermines the whole system.

– Minimum airflow set too low to chase savings. That risks condensation, stale air, complaints and a breach of the Workplace Regulations.

– Kit fitted but never commissioned. A system left in manual or at fixed speed saves nothing. Ask to see the commissioning record.

– Sensor drift. CO₂ sensors need periodic checking and recalibration, so build it into your planned preventative maintenance (PPM) schedule.

– One-line quotes. A proposal should set out zones, setpoints, minimum rates, commissioning and the savings calculation. If it does not, ask why.

Quick checklist

– Identify three zones that are empty for long periods while ventilation runs.

– Pull your last twelve months of gas and electricity bills as a baseline.

– Check the age and condition of your AHUs and fans.

– Ask whether your system supports variable speed control and whether you have a BMS.

– Note stuffiness or draught complaints from staff or tenants, by room.

– Book an initial site evaluation to establish your starting point.

– Confirm any proposal includes commissioning, a savings calculation and a sensor maintenance plan.

Ventilation tick boxes

Frequently asked questions

What is demand-controlled ventilation and how does it work?

DCV adjusts the fresh air supplied to a building according to actual occupancy, usually measured by CO₂ sensors. When a room fills, airflow increases; when it empties, airflow drops to an agreed minimum. Air quality stays within guidance while the energy spent ventilating empty space is cut.

How much energy can DCV save in winter?

It depends on how variable your occupancy is and what your plant can do. A CIBSE Technical Symposium study of an office retrofit modelled savings of up to 39 per cent on the fresh air plant, around 4 per cent of whole-building energy. Savings are highest in the heating season because less cold outside air needs warming. Ask any contractor to show the calculation for your building.

Can DCV be retrofitted to an existing commercial building?

In most cases, yes. A retrofit usually involves adding CO₂ or occupancy sensors, fitting variable speed drives to existing fans, and updating the controls or BMS. An initial site evaluation will establish whether your current plant is suitable or nearing replacement.

Does reducing ventilation cause air quality problems?

A correctly designed and commissioned DCV system can reduce unnecessary airflow while maintaining sufficient ventilation for the space. Minimum airflow rates and CO₂ control settings must be appropriate to the building, and performance should be checked during commissioning and ongoing maintenance. Poor sensor placement or overly low settings can still cause air-quality problems.

Is demand-controlled ventilation a legal requirement?

No. The law requires sufficient fresh air, not a particular way of providing it. DCV is one way of meeting that duty more efficiently. Where you install or alter a ventilation system, the work must comply with the Building Regulations, for which Approved Document F, Volume 2 is the guidance.

Conclusion

Every week your ventilation runs at full rate through half-empty spaces, you are paying to heat air the building does not need. The heating season is when that waste peaks, which makes it the right time to look, rather than deferring to next year’s budget round.

You do not need to commit to an estate-wide project. An initial evaluation will tell you where you are starting from, what your plant can support, and whether a phased upgrade makes sense. From there, the business case is a calculation, not a leap of faith.

Book a free initial HVAC site evaluation with Plumbing & Gas Solutions. Call 01908 569031 or use the form on our contact us page, and we will arrange a visit at a time that suits your building.

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top
Plumber Milton Keynes | Plumbing & Gas Solutions Ltd
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.